National drink retailer Szabowsky chose HTS INDUSTRIEBAU for their new storage building when they needed to expand their existing storage facility.
With lead times at around 6 weeks and build programmes of around 4 weeks for a standard building, Szabowsky realised that a structure from HTS INDUSTRIEBAU could give them additional space in less than 3 months; at a price that was affordable.
Wasting no time they purchased a Maxi-Span unit 10 metres wide by 20 metres long and 5 metres high. To eliminate any chance of condensation they opted for 100 mm thick wall and roof cladding for a superior level of insulation.
The building has enabled Szabowsky to quickly and affordably extend their production and storage capacity on a permanent basis ensuring the continued and sustainable growth of the business.